Off the back of one of our integrated design and build projects – we provided the setting out for a new 700m gravity sewer over rural land that was designed using our topographic survey.

Off the back of one of our integrated design and build projects – we provided the setting out for a new 700m gravity sewer over rural land that was designed using our topographic survey.